656 Full Demolition and New Construction

Miami, Florida
Private Homeowner
Full Demolition and New Home Construction
.png)
Project Overview
GH Builders transformed the 656 property through the complete demolition of the existing residence and the ground-up construction of a new two-story home. The project included site preparation, structural construction, roofing, building systems, and complete interior finishing.
Scope of Work
Full demolition and site preparation
The original structure was removed and the property was prepared for new construction.
Foundation and masonry construction
A new foundation and concrete-block structural system were constructed for the residence.
Second-story and roofing construction
The home was expanded vertically with a new upper level and coordinated roof structure.
Interior build-out and finishes
Drywall, lighting, flooring, cabinetry, appliances, plumbing fixtures, and interior finishes completed the home.
Project Results
The project replaced an aging structure with a completely new residence designed for contemporary living.
Complete property transformation
The site progressed from demolition to a finished new home under one coordinated construction process.
Increased residential space
The two-story design provides considerably more functional living area than the original structure.
Modern interior environment
A bright kitchen, elevated ceilings, new finishes, and updated systems create a move-in-ready home.
Client Feedback

.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)
.png)

.png)